The new Sherlock Holmes film might inspire mystery fans to visit the scenes of the crime or, perhaps, places that inspire classic mysteries. Otto Penzler, owner of New York's Mysterious Bookshop and editor of The Best American Mystery Stories 2009, recommends for USA TODAY some spots to go undercover.
Mohonk Mountain House, New Paltz, N.Y.
At this picturesque Hudson Valley Victorian resort, "Guests are divided into teams as they try to solve the mystery dramatization presented on opening night." Penzler says. An upcoming vampire-inspired weekend (March 12-14) is called Fangs for the Memories. "Many rooms have fireplaces, and the lake views will take away your breath." he says.
More info: 800-772-6646; mohonk.com
Kiawah Island Golf Resort, South Carolina
"You get a list of suspects when you check in for the interactive crime-solving weekend (Feb. 12-14)." Penzler says. Other than the "murders" that occur, the weather and surroundings make for a pleasant weekend. More info: 800 654-2924; KiawahResort.com
Poe Museum, Richmond, Va.
"The current exhibit here, Ratiocination: Poe the Detective, is about Poe's efforts to solve the real life murder of Mary Rogers in New York." Penzler says of the case that inspired Poe's story, The Mystery of Marie Roget. Poe spent a third of his life in Richmond. On display are his neatly written manuscripts, childhood bed and a lock of his hair. There is also a section about his mysterious death.
More info: 888-213-2763; poemuseum.org
Sherlock Holmes' , London, England
In the Footsteps of Sherlock Holmes is a guided tour of sites related to "the greatest detective who ever lived. "Penzler says of the excursion that includes references to the new Sherlock Holmes movie. "The tour finishes up at the Sherlock Holmes Pub with its re-creation of Holmes and Dr. Watson's sitting room, complete with bullet holes, and letters pinned to the fireplace mantel with a knife."
Further enquiry: 020-7624-3978, walks.com
Grand Hotel, Torquay, England
The Queen of Crime, Agatha Christie, spent her honeymoon at the hotel. "This lovely place offers bargain rates that include a boat ride on the River Dart to Greenaway and a house tour of the place where Dame Agatha lived for more than 20 years. It's a chance to enjoy a nostalgic look at another time.
60.Further enquiry: 800-005-3905, grandtorquay.co.uk/agathachristie.php
If you want to experience detective activities, you may log on_________  .
A. KiawahResort.com           B. Poemuseum.org
C. Walks.com                D. grandtorquay.co.uk.agathachristie.php
61.If you want to see some documents of real world murder you can visit__________.
A. Sherlock Holmes' London B. Kiawah Island Golf Resort
C. Poe Museum      D. Mohonk Mountain House
62.If you want to find some clues about a new detective film, you had best contact____for a tour.
A. 800 654 2924       B. 888-213-2763      C. 800-772-6646       D. 020-7624-3978


60---62   ACD   

解析

練習(xí)冊(cè)系列答案
相關(guān)習(xí)題

科目:高中英語 來源: 題型:閱讀理解

A few years ago, Paul Gerner began to gather a group of architects in Las Vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning. “I think half of them fell off their chairs,” Gerner says.

Gerner manages school facilities (設(shè)施) for Clark County, Nevada, a district roughly the size of Massachusetts. By 2018, 143,000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (樣品); they plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.

Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. “One of the biggest challenges is getting the right site orientation (朝向),”Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”

Surprisingly, the man responsible for one of the most progressive green-design competitions has doubts about ideas of eco-friendly buildings. “I don’t believe in the new green religion,” Gerner says. “Some of the building technologies that you get are impractical. I’m interested in those that work.” But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. “You never know what’s going to start the interest of a child to study math and science,” he says.

How did the architects react to Gerner’s design requirements?

A. They lost balance in excitement.                B. They showed strong disbelief.

C. They expressed little interest.                     D. They burst into cheers.

Which order of steps is followed in carrying out the project?

A. Assessment — Prototype — Design — Construction.

B. Assessment — Design — Prototype — Construction.

C. Design — Assessment — Prototype — Construction.

D. Design — Prototype — Assessment — Construction.

What makes it difficult to build green schools in Clark County?

A. The large size.                                          B. Limited facilities.

C. The desert climate.                                    D. Poor natural resources.

What does Gerner think of the ideas of green schools?

A. They are questionable.                               B. They are out of date.

C. They are advanced.                                    D. They are practical.

查看答案和解析>>

科目:高中英語 來源: 題型:閱讀理解

A few years ago, Paul Gerner began to gather a group of architects in Las Vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning. “I think half of them fell off their chairs,” Gerner says.  

Gerner manages school facilities (設(shè)施) for Clark County, Nevada, a district roughly the size of Massachusetts. By 2018, 143,000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (樣品); they plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.  

Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. “One of the biggest challenges is getting the right site orientation (朝向),” Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”  

Surprisingly, the man responsible for one of the most progressive green-design competitions has doubts about ideas of eco-friendly buildings. “I don’t believe in the new green religion,” Gerner says. “Some of the building technologies that you get are impractical. I’m interested in those that work.” But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. “You never know what’s going to start the interest of a child to study math and science,” he says.  

 

63. How did the architects react to Gerner’s design requirements?  

A. They lost balance in excitement.                B. They showed strong disbelief.  

C. They expressed little interest.                     D. They burst into cheers.  

 

64. Which order of steps is followed in carrying out the project?  

A. Assessment ― Prototype ― Design ― Construction.  

B. Assessment ― Design ― Prototype ― Construction.  

C. Design ― Assessment ― Prototype ― Construction.  

D. Design ― Prototype ― Assessment ― Construction.  

 

65. What makes it difficult to build green schools in Clark County?  

A. The large size.                                          B. Limited facilities.  

C. The desert climate.                                    D. Poor natural resources.  

 

66. What does Gerner think of the ideas of green schools?  

A. They are questionable.                               B. They are out of date.  

C. They are advanced.                                   D. They are practical.

查看答案和解析>>

科目:高中英語 來源:湖南省師大附中09-10學(xué)年高二下學(xué)期階段檢測(cè)(英語) 題型:閱讀理解

A few years ago, Paul Gerner began to gather a group of architects in Las Vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning. “I think half of them fell off their chairs,” Gerner says.
Gerner manages school facilities(設(shè)施)for Clark County, Nevada, a district roughly the size of Massachusetts. By 2018, 143,000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes(樣品); they plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.
Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. “One of the biggest challenges is getting the right site orientation(朝向),” Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”
Surprisingly, the man responsible for one of the most progressive green-design competition has doubts about ideas of eco-friendly buildings. “I don’t believe in the new green religion,” Gerner says. “Some of the building technologies that you get are impractical. I’m interested in those that work.” But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. “You never know what’s going to start the interest of a child to study math and science,” he says.
45. How did the architects react to Gerner’s design requirements?
A. They lost balance in excitement.                  B. They showed strong disbelief.
C. They expressed little interest.                       D. They burst into cheers.
46. Which order of steps is followed in carrying out the project?
A. Assessment — Prototype — Design — Construction.
B. Assessment — Design — Prototype — Construction.
C. Design — Assessment — Prototype — Construction.
D. Design — Prototype — Assessment — Construction.
47. What makes it difficult to build green schools in Clark County?
A. The large size.                                           B. Limited facilities.
C. The desert climate.                                      D. Poor natural resources.
48. What does Gerner think of the ideas of green schools?
A. They are questionable.                                 B. They are out of date.
C. They are advanced.                                      D. They are practical.

查看答案和解析>>

科目:高中英語 來源:2009年普通高等學(xué)校招生全國統(tǒng)一考試湖北卷英語試題 題型:閱讀理解

A few years ago, Paul Gerner began to gather a group of architects in Las Vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning. “I think half of them fell off their chairs,” Gerner says.
Gerner manages school facilities (設(shè)施) for Clark County, Nevada, a district roughly the size of Massachusetts. By 2018, 143,000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (樣品); they plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.
Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. “One of the biggest challenges is getting the right site orientation (朝向),”Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”
Surprisingly, the man responsible for one of the most progressive green-design competitions has doubts about ideas of eco-friendly buildings. “I don’t believe in the new green religion,” Gerner says. “Some of the building technologies that you get are impractical. I’m interested in those that work.” But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. “You never know what’s going to start the interest of a child to study math and science,” he says.
【小題1】How did the architects react to Gerner’s design requirements?

A.They lost balance in excitement.B.They showed strong disbelief.
C.They expressed little interest.D.They burst into cheers.
【小題2】Which order of steps is followed in carrying out the project?
A.Assessment — Prototype — Design — Construction.
B.Assessment — Design — Prototype — Construction.
C.Design — Assessment — Prototype — Construction.
D.Design — Prototype — Assessment — Construction.
【小題3】What makes it difficult to build green schools in Clark County?
A.The large size.B.Limited facilities.
C.The desert climate.D.Poor natural resources.
【小題4】What does Gerner think of the ideas of green schools?
A.They are questionable.B.They are out of date.
C.They are advanced.D.They are practical.

查看答案和解析>>

科目:高中英語 來源:2009年高考試題(湖北卷)解析版 題型:閱讀理解

 

A few years ago, Paul Gerner began to gather a group of architects in Las Vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning. “I think half of them fell off their chairs,” Gerner says.

Gerner manages school facilities (設(shè)施) for Clark County, Nevada, a district roughly the size of Massachusetts. By 2018, 143,000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (樣品); they plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.

Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. “One of the biggest challenges is getting the right site orientation (朝向),” Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”

Surprisingly, the man responsible for one of the most progressive green-design competitions has doubts about ideas of eco-friendly buildings. “I don’t believe in the new green religion,” Gerner says. “Some of the building technologies that you get are impractical. I’m interested in those that work.” But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. “You never know what’s going to start the interest of a child to study math and science,” he says.

1.How did the architects react to Gerner’s design requirements?

A. They lost balance in excitement.             B. They showed strong disbelief.

C. They expressed little interest.              D. They burst into cheers.

2.Which order of steps is followed in carrying out the project?

A. Assessment — Prototype — Design — Construction.

B. Assessment — Design — Prototype — Construction.

C. Design — Assessment — Prototype — Construction.

D. Design — Prototype — Assessment — Construction.

3.What makes it difficult to build green schools in Clark County?

A. The large size.                          B. Limited facilities.

C. The desert climate.                      D. Poor natural resources.

4.What does Gerner think of the ideas of green schools?

A. They are questionable.                   B. They are out of date.

C. They are advanced.                       D. They are practical.

 

查看答案和解析>>

同步練習(xí)冊(cè)答案